Cherry Split

Editors rating: 
0
0

Group facilitation methods: Analysis, Idea Generating

Identification

Alternative names: 
attribute listing
Level of process: 
Method
Intent or purpose: 

Cherry Split is an attribute listing type of techneque which takes an existing product or system, breaks it into parts, identifies various ways of achieving each part, and then recombines these to identify new forms of the product or system.

Recognizable Components: 

1. State the challenge - in two words
2. Split the challenge into two separate attributes
3. Split each attribute into two further attributes
4. continue splitting each attribute into 2 more attributes, until you have enough to work with.
5. look at each attribute at a time and try thinking of ways to change or improve it.
6. re-assemble the attributes

Types of Participants: 
Project Planners, Account-managers

Howto

Usual or Expected Outcomes: 
Detailed outcomes, since each step brings one closer to the core/ cause.
Level of participation: 
only thinking is required, participans can sit if somebody lists the attributes.
How is success evaluated: 
Not guaranteed since only brainstorming is then only way of processing.
Examples of successes and failures: 
Solutions can be found if the attribution is takes depth. Of course group can stuck on every next step.
Type of Facilitator-Client Relationship: 
not needed.
Level of Difficulty to Facilitate: 
No specific skills required
Setting and Materials: 
Blackboard or Writing board.
Resources Needed: 
the problem or the project
Pre-Work Required: 
no, since it is a arbitar attribution
Procedures: 

1. State the challenge - in two words
2. Split the challenge into two separate attributes
3. Split each attribute into two further attributes
4. continue splitting each attribute into 2 more attributes, until you have enough to work with.
5. look at each attribute at a time and try thinking of ways to change or improve it.
6. re-assemble the attributes

How flexible is the process?: 
not flexible, since stops can be expected in each step

Background

Developer: 
Michael Michalko
History of Development: 

Cherry Split is an attribute listing type of techneque developed in the early 1930's.

Selected publications: 
References: 

Thinkertoys.

License Model: 
Free (or unattributable)

Suppliers

Creators: 
Namesort iconCityCountry
VALDUSPort LouisMauritius
Trainers: 
Namesort iconCityCountry
VALDUSPort LouisMauritius
Consultants: 
Namesort iconCityCountry
VALDUSPort LouisMauritius
Supporters: 
Namesort iconCityCountry
VALDUSPort LouisMauritius

User login

Poll

How has the current economic downturn affected your facilitation practice?
I have less work than I did a few years ago.
25%
I am facilitating different processes from what I did a few years ago.
13%
I work with different clients than I did a few years ago.
38%
I haven’t noticed much difference.
0%
I have more work now than I had a few years ago.
25%
Total votes: 8

Advertizing

Google Ads